News 2016 year

17 may 2016

The first diesel train DR1AC is commissioned

The first diesel train DR1AC-219 is completed, certified and commissioned in May 2016
There is an impressive diesel multiple unit (DMU) modernization project going on in Latvia with the total of 6 DR1AC trains are repowered and completely modernized up to the latest European railway standards.  Trains are designed for public passenger carrier AS “Pasažieru vilciens”, Trains are designed for the interregional traffic between the cities of Latvia 

Rīgas Dīzelis DG is participating in the modernization process with Rīgas Vagonbūves Rūpnīca, Daugavpils Lokomotīvju Remonta Rūpnīca un VRC Zasulauks

The modernization project consists of six diesel trains (19 cars): three-car lineup (5pcs.), four wagon composition (1pc.)

Rīgas Dīzelis DG has delivered diesel genset E140D2CZ  made according to individual project for diesel trains.

 

Model:

E140D2CZ

Diesel:

Deutz

Parameters:

140 kVA // 50 Hz // 400 V

Quantity:

8 pcs.

Application:

Auxiliary diesel genset

Customer:

A/S DLRR

Train type:

Passenger diesel train

Project

DR1A


Fig.1 Presentation of the modernized diesel train DR1AC-219 at the Riga Central station on May 2016

Fig.2 Diesel genset E140D2CZ in the engine room 

all news